Detroit Wastewater Sewerage Department

Project Info

  • Construction Date

    March 2013

  • Owner

    Detroit Wastewater Sewerage Department

  • Location

    Romulus, Michigan

  • Service

    High Performance Coating

Wick Road Pumping Station


The pump room located at DWSD’s Wick Road Pumping Station required waterproofing and concrete repair(s). Patriot removed the defective concrete topping, repaired the concrete substrate, and installed 80 Mils of IC-800 Polyurea over the entire concrete lid of the pump room. The Polyurea coating was also textured to provide slip resistance on the surface of the pump room lid to accommodate DWSD personnel foot traffic.