GM Warren Transmission

Project Info

  • Construction Date

    August 2016

  • Owner

    General Motors

  • Location

    Warren, Michigan

  • Service

    High Performance Coating

TR2 Substation Epoxy Flooring


Furnish and install poly‐aspartic flooring system for the TR2 substation. The process was spray applied using a SBR-10 100% pure polyurea flooring system.